Battery Work/Breakdown Lamp.

North Face

Registered User
I picked up one of these the other day, (after watching my last torch in the rear-view mirror falling off the roof of the car on the M11) - 400/200 lumens work lights and a really decent breakdown red lashing LED for just a tenner. Strong magnet on the bottom too, will hang upside-down easily. Comes with one set of cheap batteries and a set of Duracells. Now under saddle.


https://www.homebase.co.uk/nebo-nb6306-led-big-larry-work-light_p381847
 
Last edited:
Top