1. Welcome to the new VFR Forum. Please be sure to read the "Welcome to the new forum" thread in General Spouting. This contains some important information. I hope you enjoy the new site. Steve (The Gremlin) Just so you are aware the new URL for this site is: vfr.bikersoracle.com
    Dismiss Notice

Battery Work/Breakdown Lamp.

Discussion in 'Gadgets' started by North Face, Sep 18, 2017.

  1. North Face

    North Face Registered User

    I picked up one of these the other day, (after watching my last torch in the rear-view mirror falling off the roof of the car on the M11) - 400/200 lumens work lights and a really decent breakdown red lashing LED for just a tenner. Strong magnet on the bottom too, will hang upside-down easily. Comes with one set of cheap batteries and a set of Duracells. Now under saddle.


    https://www.homebase.co.uk/nebo-nb6306-led-big-larry-work-light_p381847
     
    Last edited: Sep 18, 2017

Share This Page